Repairs, sealing & specialists

Expansion and control joints in concrete

Concrete shrinks as it dries and moves with temperature.

27 businesses listedUpdated October 2026
In short

Concrete shrinks as it dries and moves with temperature. Control joints (saw cuts) make it crack in a straight line where you want; expansion joints separate the slab from walls, other slabs and structures.

What expansion & control joints involves

  1. Plan joint layout before the pour
  2. Place expansion joint filler against walls and existing slabs
  3. Saw-cut control joints at the right time (usually within 24 hours)
  4. Clean joints and fill with flexible sealant where needed
Advertisement

How much expansion & control joints costs

Joints are normally part of the concreter's price. Re-sealing old joints is quoted per job; there's no reliable public per-metre price.

Estimate your job in the calculator Is my quote fair?

Before you hire

  • Ask for the joint layout on paper before the pour
  • Keep panels roughly square – long thin panels crack
  • Check joints are cut deep enough (about a quarter of the slab depth)

Standards and approvals

Joint design in structural slabs is set by the engineer under AS 3600; residential pavement guidance is in AS 3727.1.

Advertisement

Who does expansion & control joints

27 businesses in the directory list this service; 27 of them mention it on their own website (the quote is on each business page).

New South Wales 8 businesses
Victoria 2 businesses
  • Concreter
    Concrete By BayleafCamberwell, VIC
    • Concrete driveways
    • Driveway crossovers
    • Concrete paths & footpaths
  • Concreter
    Metric ConcretingThomastown, VIC
    • Concrete driveways
    • Concrete paths & footpaths
    • Garage floors
Queensland 8 businesses
Western Australia 3 businesses
  • Decorative & resurfacing
    All Class ConcreteFremantle, WA
    • Concrete driveways
    • Concrete paths & footpaths
    • Steel reinforcement (reo)
  • Decorative & resurfacing
    Core ConcretingNewman, WA
    • Driveway crossovers
    • Concrete paths & footpaths
    • Car parks & loading bays
  • Polished & epoxy floors
    Art of ConcreteJoondalup, WA
    • Commercial slabs
    • Footings, foundations & columns
    • Steel reinforcement (reo)
South Australia 2 businesses
Tasmania 1 business
Northern Territory 1 business
  • Concrete cutting & drilling
    Di-Core Drilling & CuttingRenner Springs, NT
    • Concrete driveways
    • Commercial slabs
    • Steel reinforcement (reo)
Australian Capital Territory 2 businesses
  • Concreter
    Top Notch Canberra ConcreteBelconnen, ACT
    • Concrete driveways
    • Concrete paths & footpaths
    • Car parks & loading bays
  • Builder, civil or landscaping
    CPS Concrete GroupFyshwick, ACT
    • Car parks & loading bays
    • House slabs
    • Footings, foundations & columns
Advertisement

Common questions

How far apart should control joints be?

As a rule of thumb, no more than about 30 times the slab thickness in each direction – around 3 m for a 100 mm slab – and panels close to square.

When are joints saw-cut?

As soon as the concrete can be cut without ravelling, usually within a day. Late cuts let random cracks form first.

What fills an expansion joint?

A compressible filler strip, often topped with a flexible sealant to keep water and dirt out.

Related guides